Membrane material: Polyamide thin film composite
Spirally wound element
Epoxy-based FRP overwrap
Low or ultra low pressure application for brackish water treatment
Important Operation Notes
1) It is critical to follow approved start-up procedure to prevent membrane damage due to overfeeding or hydraulic shock. Before initiating system, loading of the RO elements, instrument calibration, membrane pretreatment and other system checks should be conducted.
2) Minimize any pressure shock or cross-flow fluctuation on the spiral elements at all times. During start-up, a gradual, incremental change from a standstill to operating state is recommended.
3) Maximum pressure drop across an entire pressure vessel (housing) is 50 psi (3.4 bar).
4) No static pressure should ever be built up on permeate side.
5) Keep elements moist at all times after initial wetting.
6) If operating limits and guidelines are not followed, the Limited Warranty will be void.
7) In case of prolonged system shutdowns, it is recommended that membrane elements be immersed in a preservative solution to prevent bacteria growth.
8) Permeate collected from first hour of operation should be discarded.
9) It is customer's responsibility to make sure that the chemicals and lubricants do not have detrimental effects on RO elements.
Note: Other brands RO membranes are available, just sending us an enquiry, we will do our best to help you!